Dear Gurus,
I have done all the required configurations and settings in SPRO for creating a shipment. I have also created a shipment on the basis of different routes and Transportation Zones.
The problem I have is when I go to T-Code VT20 to monitor my Shipments, it always shows the shipment to be in the Planned Status.
How do I process my shipment further so that i can track my shipment in the different stages of the Shipment?
Also I have configured different stages for my route. There are 5 stages for the route defined. Is it possible to see the status at this stage level in SAP?
Also if any of you gurus know some extra scenarios please send me a link or please mention them here so that I can try them in the system at hand.
Thanks and Regards
SAHIL AJIT GUPTE