Quantcast
Channel: SCN : Popular Discussions - SAP for Travel and Transportation
Viewing all 2102 articles
Browse latest View live

Transportation RV56ABST

$
0
0

Hi.

 

I am using the report RV56ABST in transaction VT01N for post goods issue and billing.

 

When the billing is delivery related it is working fine, but when the billing is order related (credit) it is doing just the goods issue and is not billing the order.

 

Does anybody knows how can I solve this?

 

Thanks,

 

Gustavo.


Warehouse Management: Problem with Capacity Check Method 6 (Logistics Execution)

$
0
0

Hello,
at the moment we have capacity check method 5 in use. But it doesn`t have all the features we need.

Therefore we want to use capacity check method 6(Usage check based on material plus SUT) to achieve that the same material can be stored in the same storage bin and increases capacity as well as it is a add of the same material (if settings made in management view).

In the past we have used capacity check method 5; the problem is here that the capacity increases one time. Then you can put the same material to the storage bin all the time without increasing capacity.


If I want to use the
Capacity Check Method 6 I have to fill in Capacity consumption (field MLGN-MKAPV in Warehouse Management (material management) view 1). Otherwise this error message orrurs: Message no. L3066: "Not all the data has been defined for the capacity check (material 03-154.803)"
Is it possible to avoid message L3066?

Example:
Settings WM2 view: "10" (MLGN-LHMG1) "ST" pro "Ls7" (mlgn-LETY1)

At the moment I fill in 0,001 to field MLGN-MKAPV. Per
SUT (storage unit type) is increased then the capacity (for example, 10 for example in Ls7)
and additionally by 0,001 per material.
This is the desired result with the exception that 0,001 should not be added.

If I get a new material receipt on this storage bin (same material, again 10 ST) then the used capacity on the storage bin rises from 10,01 to 20,02..

The utilization rises, too.

The only problem is that the remaining capacity every time decreases by 0.001 per material. I would be
happy if I could turn off the message L3066. Then I could set MLGN-MKAPV to 0.
Is this possible and is this even the right approach?
I hope you can help me,
Sincerely yours

Make fields mandatory in Fleet Object (IE31)

$
0
0

Hello,

 

I have successfully created a fleet object in Tcode ie31. However, I want to make some fields in VehicleID/Measurments and DSD Vehicle Data tab , mandatory.

Could you please help me with this.

 

Thank you in advance.

delivery trans. plan. status

$
0
0

Hello people,

 

I would like to ask you for help in this scenario:

- we have two deliveries D1 (replenishment delivery between shipping points) and D2 ( delivery to customer) which are transport relevant "Transportation planning status" = A

- then there is shipment 1

    - delivery D1 is transferred from shipping point 1 to shipping point 2 and remains here - shipment ends here

    - delivery D2 is transferred from shipping point 1 to shipping point 2 and is waiting for other shipment

    - this shipment has to have these deliveries as they are - it is not possible to separate them into two shipments - our forwarder is using it together and we have to accept this

- shipment 2 is created

- delivery D2 is shipped from shipping point 2 to customer - shipment ends here

 

 

What I would like to achieve is:

- shipment 1 is created (shipment 2 will be created later)

    - D1 should have "Transportation planning status" = C

    - D2 should have "Transportation planning status" = B - shipment is not finished yet

    - in ideal way there could be two stages

        - stage 1 for D1 - maybe "direct"?

        - stage 2 for D2 - maybe "main"?

- after shipment 2 is created

    - D2 should have "Transportation planning status" = C - shipment is finished now

 

  Question:

- is it possible to have shipment 1 as I suggested at once?

- is it possible for shipment 1 and shipment 2 to have only 1 shipment type?

- could you provide any idea how to solve this?

 

What I know according to the help and experience:

- if shipment type is type "direct", delivery will be always "C" - it skips "B" status - possible solution for shipment 2 but not for shipment 1 (I still would like to have only 1 shipment type)

- if I tried to use different shipment types (not "direct") and played with stages and its "Leg indicator" I was never able to achieve requested statuses for shipment 1 deliveries

 

Thank you

David

logistics steps in sap bw

$
0
0

can any one suggest me the steps of Logistics in SAP exactly as they are?

SAP WM Group already processed

$
0
0

Guys. I looked up online for possible answers but no success

 

 

Problem: An open TR  (total qty 50 )is assigned to a group from which there is a Transfer Order for 15 (already picked).

 

Now if I try to create TO for remaining TR quantity (35) via LT04. I get this warning message;

 

TR XXXXX is already assigned to a group XX XXXX.

 

If I ignore this message and proceed with TO creation. it creates TO without Group number.

 

 

 

Is there any way to create TO with the group number? Is it standard SAP behavior? Is there any notes or fix or config change?

 

PS: I believe since the group is already processed so it doesnt allocate it to future TO

effective ways of filling the setup tables

$
0
0

I faced this question quite a while,what are the effective ways to delete a set up table?

Automatic packing in Shipment document

$
0
0

Hi

 

Below are two scenarios where i need guidance.

 

---------------------------------------------------------------

Scenario - 1

My scenario is such where i need to have automatic packing at delivery as well as shipment level.

 

First the material will be packed under HU in the delivery automatically. This is happening as required.

Similarly multiple such deliveries will be created.

 

All those delivery will be packed under single pallet in the shipment document. I need to make this packing automatic. Means as soon as i create shipment, system shall automatically pack the HUs from different deliveries into the single pallet.


Can you please let me know that whether this is possible and if yes then how?

 

--------------------------------------------------------------

Scenario - 2

 

Here i want Automatic packing to be done directly at shipment level, means material will not be packed in delivery but will be packed directly in shipment.

 

Here i have done the entire required configuration for automatic packing in shipment.

By doing so, system is determining the packing proposal but to pack the items i need to manually click on "Automatic Packing" button in the shipment document. Then only the material are being packed unlike the delivery where the material will be packed automatically as soon as we create the delivery.

 

I think in delivery it might be happening because we have button to activate automatic packing in delivery at the delivery document type configuration (OVLK), but such setting is missing in the shipment type configuration.

 

Can you please let me know if there is a way to pack materials automatically in shipment without clicking on "Automatic Packing"?

 

Thanks,

Ritesh Tailor


Global Freight Forwarding and Customs Brokerage

$
0
0

Hello,

 

Currently researching SAP, and am looking for information RE how SAP supports global freight forwarding and customs brokerage features. Is this a fairly well developed feature set of SAP via existing modules? If so, which modules should I be reviewing to begin to understand better what functionality exists "out of the box."

 

Also, if support materials/documentation exists for these modules I would greatly appreciate being pointed at them.

 

Thank you

 

Jeff

Market data exchange rate is not intended for reference procedure VBRK

$
0
0

Message no. GLE_FXR005

Market data exchange rate is not intended for reference procedure VBRK

hi we are getting error at the time of using Transaction code VF02.  we are unable to post the FI document/

Warehouse Management: Problem with Capacity Check Method 6 (Logistics Execution)

$
0
0

Hello,
at the moment we have capacity check method 5 in use. But it doesn`t have all the features we need.

Therefore we want to use capacity check method 6(Usage check based on material plus SUT) to achieve that the same material can be stored in the same storage bin and increases capacity as well as it is a add of the same material (if settings made in management view).

In the past we have used capacity check method 5; the problem is here that the capacity increases one time. Then you can put the same material to the storage bin all the time without increasing capacity.


If I want to use the
Capacity Check Method 6 I have to fill in Capacity consumption (field MLGN-MKAPV in Warehouse Management (material management) view 1). Otherwise this error message orrurs: Message no. L3066: "Not all the data has been defined for the capacity check (material 03-154.803)"
Is it possible to avoid message L3066?

Example:
Settings WM2 view: "10" (MLGN-LHMG1) "ST" pro "Ls7" (mlgn-LETY1)

At the moment I fill in 0,001 to field MLGN-MKAPV. Per
SUT (storage unit type) is increased then the capacity (for example, 10 for example in Ls7)
and additionally by 0,001 per material.
This is the desired result with the exception that 0,001 should not be added.

If I get a new material receipt on this storage bin (same material, again 10 ST) then the used capacity on the storage bin rises from 10,01 to 20,02..

The utilization rises, too.

The only problem is that the remaining capacity every time decreases by 0.001 per material. I would be
happy if I could turn off the message L3066. Then I could set MLGN-MKAPV to 0.
Is this possible and is this even the right approach?
I hope you can help me,
Sincerely yours

Global Freight Forwarding and Customs Brokerage

$
0
0

Hello,

 

Currently researching SAP, and am looking for information RE how SAP supports global freight forwarding and customs brokerage features. Is this a fairly well developed feature set of SAP via existing modules? If so, which modules should I be reviewing to begin to understand better what functionality exists "out of the box."

 

Also, if support materials/documentation exists for these modules I would greatly appreciate being pointed at them.

 

Thank you

 

Jeff

VT01N: Deliveries list includes PGI completed deliveries

$
0
0

Hi

 

While creating shipment through VT01N, in the selection for deliveries, we are giving the shipping point, a date range for the Delivery Date field, the total good movement status as 'A' and the Transportaion Planning Status as 'A, B'. But, the list of deliveries displayed includes those deliveries that have the transportaion planning status as 'C' and the Goods Issue status as 'C'. What could be the reason for having these deliveries in the list that can be included in the shipment?

 

Thanks for your attention.

 

Regards,

Ravi

storage bin does not exist check your entry - message no: L9009

$
0
0

Dear Experts,

 

I mistakenly deleted the assignment of Plant, Storage Location and warehouse ( SPRO > IMG > Enterprise Structure > assignment > Logistics Execution > assign warehouse number to plant/storage location ) and reassigned them again after 5 mins, but it seems like it has emptied the whole warehouse or plant . Because when I am doing 'post good issue' in delivery document it gives me an error that this material does not exist in warehouse A01. How can i fix this problem?

 

2-) And would deleting an warehouse/plant assignment will  all the material in all other warehouses ? The project i am working on has 4 warehouses.

Auto-assign Fwd Agent and Shipment route to Shipment through VT04

$
0
0

Hello guys,

 

I'm having some problems while trying to automatize the Fwd Agent and Shipment route in each Inidividual Shipment I create through T-code VT04 (Collective Processing).

 

When I create Shipments through this T-code, the fields I mentioned stay blank, even though I assigned to each Delivery its Route. The thing I'm trying to do is to collectively create different Shipments based on Grouping Criteria: Route. Then, even though it correctly creates the proper shipments, it doesn't automatically assign to each them the Fwd Agent and the Route.

 

This leads to two direct problems: It decreases the automatization I'm after for this specific process (I'd like to create shipments and then just Plan them for Goods Issue and Billing, directly) and it difficults the Shipment Selection through T-Code VT11 (i.e. my client wouldn't be able to selec Shipments based on Routes or on Agents, since there was no direct assignment).

 

Manually, the process works just fine. I've configured Routes and I assigned to each Route its Fwd Agent in T-Code 0VTC.

 

Thank you very much in advance for your help and attention,

 

Manuel Nascimento


SAP A&D or DFPS for airline

$
0
0

Hello, there.

 

I'm collecting the funtional requirement from an airline for ERP implementation.  I have found that some functions are in SAP A&D and other in DFPS.  For example, SPEC2K, rotable management, initial provisioning etc. are included in A&D.  But supporting funcions of flight operations such as flight order, flight plan are included in DFPS. 

 

Are these two (A&D and DFPS) different solutions requiring difference license charge?  Can I use A&D funciton while we implement DFPS only???  We need all functions in A&D and DFPS.  Can any one give me the clear understanding bewteen SAP A&D and DFPS?

 

 

Thanks!!

 

Kyunghee

SAP Business One - Profit Per Truck Configuration

$
0
0

Hi Gurus,

 

I have been asked by my company (3rd party logistics) to look at the current SAP configuration as there is a current struggle to view the profits per truck.  I am new the the world of SAP, and am enjoying the learning curve.

 

From the discussions in SCN that I have read, there seems to be a definite tendency to structure trucks as a profit center.  Currently the trucks in the system have been defined as projects. 

 

From the above I have two initial questions

 

1.  The trucks as projects strategy seems quite limiting (from my limited point of view) and would like to ask if it would be the right decision to start looking at moving towards the profit centre design?

 

2.  The current version of SAP (8.82.070 PL:07)  doesn't have the Profit Centre module under the Financials -> Cost Accounting menu - even though the documentation I have found refers to this being standard - is this because of the version of SAP B1?

 

Look forward to any help that can be provided.

 

Thanks,

 

Daniel

Access not made (initialized field)

$
0
0

Hi,

I can notcalculate the cost offreight in VI01.
I created therecordconditions, but the systemdid notcalculateanything.
If I goin the analysistells me that:

 


 

But I haveaddedthe 'Bulkiness Group' in the record conditions.

 

What could be theproblem?


Thanks a lot.

delivery trans. plan. status

$
0
0

Hello people,

 

I would like to ask you for help in this scenario:

- we have two deliveries D1 (replenishment delivery between shipping points) and D2 ( delivery to customer) which are transport relevant "Transportation planning status" = A

- then there is shipment 1

    - delivery D1 is transferred from shipping point 1 to shipping point 2 and remains here - shipment ends here

    - delivery D2 is transferred from shipping point 1 to shipping point 2 and is waiting for other shipment

    - this shipment has to have these deliveries as they are - it is not possible to separate them into two shipments - our forwarder is using it together and we have to accept this

- shipment 2 is created

- delivery D2 is shipped from shipping point 2 to customer - shipment ends here

 

 

What I would like to achieve is:

- shipment 1 is created (shipment 2 will be created later)

    - D1 should have "Transportation planning status" = C

    - D2 should have "Transportation planning status" = B - shipment is not finished yet

    - in ideal way there could be two stages

        - stage 1 for D1 - maybe "direct"?

        - stage 2 for D2 - maybe "main"?

- after shipment 2 is created

    - D2 should have "Transportation planning status" = C - shipment is finished now

 

  Question:

- is it possible to have shipment 1 as I suggested at once?

- is it possible for shipment 1 and shipment 2 to have only 1 shipment type?

- could you provide any idea how to solve this?

 

What I know according to the help and experience:

- if shipment type is type "direct", delivery will be always "C" - it skips "B" status - possible solution for shipment 2 but not for shipment 1 (I still would like to have only 1 shipment type)

- if I tried to use different shipment types (not "direct") and played with stages and its "Leg indicator" I was never able to achieve requested statuses for shipment 1 deliveries

 

Thank you

David

SAP WM Group already processed

$
0
0

Guys. I looked up online for possible answers but no success

 

 

Problem: An open TR  (total qty 50 )is assigned to a group from which there is a Transfer Order for 15 (already picked).

 

Now if I try to create TO for remaining TR quantity (35) via LT04. I get this warning message;

 

TR XXXXX is already assigned to a group XX XXXX.

 

If I ignore this message and proceed with TO creation. it creates TO without Group number.

 

 

 

Is there any way to create TO with the group number? Is it standard SAP behavior? Is there any notes or fix or config change?

 

PS: I believe since the group is already processed so it doesnt allocate it to future TO

Viewing all 2102 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>